Skip to content
Free for 14 days · 25 credits to finalise designs · no card needed
Use case / Distribution transformers

Distribution Transformer Design Software

For engineers who answer distribution transformer tenders: go from the specification to a design that meets the guaranteed losses and impedance, a costed bill of materials and the documents the tender asks for. Oil-immersed, three-phase, two-winding units from 100 kVA.

See how it works
The tender

Built around the distribution transformer tender

A distribution transformer tender fixes most of the design before you start: the rating and voltage ratio, the vector group, the tapping range, and the guaranteed no-load loss, load loss and impedance, often with an energy-efficiency level on top. The work is finding the least costly active part that meets all of them at once, and pricing it before the bid closes.

TransformerOS starts from that specification. Enter the rating, the HV and LV voltages, the vector group (Dyn11, Dyn1, Dyn5, Yyn0 and others), the tapping and the guarantees. Auto-design then searches for a core and windings that meet them, with the objective set to material cost or to total owning cost. You get a design to review module by module, and a cost to quote from.

India

IS 1180 energy-efficiency levels and BEE star ratings

For Indian utility and BEE-labelled work, choose IS 1180 and the level the tender calls for: Conventional, or Energy Efficiency Level 1, 2 or 3. The loss presets follow the rating, the HV class (11, 22 or 33 kV) and the conductor, copper or aluminium. At the energy-efficiency levels there is no positive tolerance on the losses, so the design is checked against the figures themselves.

To see where a pair of guaranteed or measured losses lands on the BEE scale, use the free BEE star rating calculator (16 to 2500 kVA). Why a unit can pass at full load and still miss a band at half load is explained in energy efficiency levels and star ratings.

Active part

Core and windings for 11, 22 and 33 kV designs

The core is a stepped CRGO core. You choose the grade and the flux density; no-load loss comes from the grade's loss tables with a building factor, and the core screen gives the step dimensions and a lamination step table. What drives that loss, and why the building factor matters, is covered in where no-load loss really comes from.

Windings can be layer, disc, crossover, foil or helical, in copper or aluminium. For each winding the calculation gives the turns, conductor size, current density and resistance, and adds eddy and stray loss to the I²R loss. Aluminium is common at distribution ratings; copper or aluminium windings sets out what changes in the design when you switch.

Checks

Losses, impedance and temperature rise, checked together

Adding conductor area to cut load loss moves the impedance; lowering the flux density to cut no-load loss changes the core and the winding heights. So the results are shown together, each guaranteed value beside the achieved one with its margin, green when it passes and red when it does not:

  • No-load loss and load loss against the guarantees.
  • Impedance against the guaranteed value and its tolerance.
  • Winding and top-oil temperature rise from the IEC 60076-7 ONAN thermal model.
  • Short-circuit forces and thermal withstand of the windings.

Impedance at the extreme taps deserves the same attention as at the principal tap; impedance and the tap range explains why.

Evaluation

Lowest owning cost, not lowest first cost

Many utilities evaluate bids on capitalised losses: the price, plus A times the no-load loss, plus B times the load loss. The design that is cheapest to build can lose that evaluation to one with more copper and less loss. Set the auto-design objective to total owning cost with the tender's A and B factors, and it trades material against losses on the same basis the evaluator will use.

On the Professional plan and above, the Pareto optimiser sweeps core diameter, flux density, current density and conductor choices and ranks the candidates by total owning cost. The reasoning is set out in total owning cost, not first cost.

Deliverables

From design to tender documents: BOM, GTP, GA drawing, report

  • A costed bill of materials (conductor, core steel, insulation, oil and tank) priced at your own material rates.
  • A GTP sheet with the guaranteed and achieved values side by side, to check against the tender schedule. How to read a guarantee sheet covers what to look for before you sign one.
  • A general-arrangement drawing of the tank (radiator, corrugated fin, elliptical or plain, with or without a conservator) and the oil quantity, with DXF export on paid plans.
  • A PDF report with your logo; on the Professional plan and above, the Report Template Designer sets its layout and sections.

Working on a design is free. Finalising it locks the design, uses credits and releases the clean documents; until then they are view-only drafts.

Export

Export tenders: IEC 60076, DOE, Ecodesign, SANS

The same specification can be designed to a different reference profile. The IEC 60076 profile works to the tender's own loss guarantees with the IEC tolerances; the US DOE 2016 and 2029 efficiency levels apply up to 2500 kVA; EU Ecodesign Tier 1 and Tier 2 and SANS 780 carry their own loss limits. Changing the profile changes the presets and the checks the design is held to. One design, many standards walks through what changes for export work.

Responsibility

What stays with your engineers

TransformerOS calculates and checks a design; it does not certify it. The design review, the decision to manufacture, type and routine testing, and certification all remain with the manufacturer and its qualified engineers.

Each module has a “How this is calculated” note that sets out the basis of its results, so that review can be done properly, and the report carries a design disclaimer and the designer's sign-off.

Try it on your next tender.

Fourteen days free, with 25 credits to finalise designs. No card needed. Prices depend on your country and are on the pricing page.

See how it worksPricing